|
CONSTRUCCION INSTITUTO BASICO ALDEA PINARES CAHABON, ALTA VERAPAZ |
|
|
|
0.00 |
0.00 |
| 300030 |
300030-CONSTRUCCION INSTITUTO BASICO ALDEA SALAC I CAHABON, ALTA VERAPAZ |
Metro cuadrado |
432.10 |
897,440.36 |
403.56 |
354,878.00 |
| 301554 |
301554-CONSTRUCCION INSTITUTO BASICO ALDEA BELEN CAHABON, ALTA VERAPAZ |
Metro cuadrado |
314.00 |
92,874.82 |
314.00 |
0.00 |
| 346515 |
346515-CONSTRUCCION INSTITUTO BASICO CASERIO SANTA ROSA CHIVITE CAHABON, ALTA VERAPAZ |
Metro cuadrado |
510.00 |
2,330,186.00 |
0.00 |
0.00 |
| 337196 |
337196-CONSTRUCCION INSTITUTO BASICO AREA URBANA CAHABON, ALTA VERAPAZ |
Metro cuadrado |
1,980.00 |
8,005,000.00 |
510.44 |
0.00 |