193300 |
193300-MEJORAMIENTO CARRETERA CON PAVIMENTO CABECERA MUNICIPAL, SAN MIGUEL TUCURÚ, ALTA VERAPAZ |
Metro |
1.00 |
334,995.75 |
1.00 |
334,995.75 |
313319 |
313319-MEJORAMIENTO CAMINO RURAL CON PAVIMENTO RIGIDO ALDEA CHICOBAN HACIA ALDEA CUCANJA, TUCURU, ALTA VERAPAZ |
Metro cuadrado |
10,090.00 |
7,203,184.00 |
0.00 |
0.00 |
281849 |
281849-MEJORAMIENTO CAMINO RURAL CON EMPEDRADO DE CARRETERA 7E HACIA ALDEA PENIEL, TUCURU, ALTA VERAPAZ |
Metro |
144.79 |
477,342.00 |
0.00 |
0.00 |
298720 |
298720-MEJORAMIENTO CAMINO RURAL DE CUCANJA HACIA ALDEA VOLCANCITO, TUCURU, ALTA VERAPAZ |
Metro |
2,784.00 |
209,837.04 |
0.00 |
209,837.04 |
277675 |
277675-MEJORAMIENTO CAMINO RURAL CON PAVIMENTO RÍGIDO DE ALDEA SEPACAY HACIA ALDEA RAXIHA, TUCURU, ALTA VERAPAZ |
Metro |
1.00 |
470,592.00 |
0.00 |
0.00 |
298287 |
298287-MEJORAMIENTO CAMINO RURAL CON PAVIMENTO RÍGIDO PARCELAMIENTO NUEVA ESPERANZA, TUCURU, ALTA VERAPAZ |
Metro |
1.00 |
205,800.00 |
0.00 |
135,450.00 |
334428 |
334428-CONSERVACION CARRETERAS DE TERRACERIA CASERIO SACPUR A CASERIO CHICHICASTE, TUCURU, ALTA VERAPAZ |
Metro cubico |
12,810.00 |
612,247.12 |
12,810.00 |
164,608.50 |
341140 |
341140-MEJORAMIENTO CALLE CON PAVIMENTO RIGIDO SECTOR I Y II, ALDEA CHICOBAN, TUCURU, ALTA VERAPAZ |
Metro lineal |
411.00 |
820,000.00 |
0.00 |
0.00 |
334902 |
334902-CONSERVACION CARRETERAS DE TERRACERIA ALDEA PANTOC, TUCURU, ALTA VERAPAZ |
Metro cubico |
12,810.00 |
900,000.00 |
0.00 |
0.00 |
298709 |
MEJORAMIENTO CAMINO RURAL SECTOR SAN ROGELIO ALDEA LOS PINOS, TUCURU, ALTA VERAPAZ |
Metro cuadrado |
1.00 |
235,500.00 |
0.00 |
0.00 |
260912 |
260912-MEJORAMIENTO CAMINO RURAL CON PAVIMENTO RIGIDO DE CARRETERA 7E HACIA ALDEA LAS PALMAS, TUCURU, ALTA VERAPAZ |
Metro |
1.00 |
99,558.52 |
0.00 |
0.00 |
272743 |
272743-APOYO MATERIALES DE CONSTRUCCION COMBUSTIBLES LUBRICANTES PARA MEJORA DE CAMINOS RURALES Y URBANOS TUCURU, ALTA VERAPAZ |
Persona |
41,200.00 |
3,272,059.36 |
25,780.00 |
2,497,390.51 |
335409 |
335409-CONSERVACION CALLE BARRIO LA VEGA, ALDEA CHICOBAN HACIA ALDEA CUCANJA Y CASERIO SACPUR, TUCURU, ALTA VERAPAZ |
Metro cubico |
0.00 |
0.00 |
0.00 |
0.00 |
298348 |
298348-CONSTRUCCION PUENTE PEATONAL (HAMACA) CASERIO PAMPOLVO, TUCURU, ALTA VERAPAZ |
Metro cuadrado |
6.07 |
1,122,770.00 |
0.00 |
1,061,577.50 |