322718 |
322718-CONSERVACION SISTEMA DE AGUA POTABLE Y POZOS EN EL MUNICIPIO DE AMATITLAN, GUATEMALA |
Mes |
12.00 |
8,031,000.00 |
12.00 |
6,609,180.70 |
334696 |
334696-CONSTRUCCION SISTEMA DE AGUA POTABLE SECTOR LAS NINFAS, AMATITLAN, GUATEMALA |
Metro |
108.00 |
1,030,638.00 |
108.00 |
972,960.04 |
314403 |
314403-CONSTRUCCION SISTEMA DE AGUA POTABLE MERCADO SUR, AMATITLAN, GUATEMALA |
Metro |
114.00 |
2,000,000.00 |
114.00 |
1,839,932.30 |
314163 |
314163-CONSTRUCCION SISTEMA DE AGUA POTABLE FINCA BELEN, ALDEA TACATON, AMATITLAN, GUATEMALA |
Metro |
182.88 |
2,000,000.00 |
46.00 |
487,500.00 |
339733 |
339733-CONSTRUCCION SISTEMA DE AGUA POTABLE TANQUE DE DISTRIBUCION, ALDEA EJE QUEMADO, AMATITLAN, GUATEMALA |
Metro cubico |
56.00 |
364,783.00 |
0.00 |
0.00 |
305930 |
305930-CONSTRUCCION SISTEMA DE AGUA POTABLE TANQUE DE CONCRETO EN ESCUELAS ALDEAS EL PEPINAL, TACATON Y LOMA LARGA, AMATITLAN, GUATEMALA |
Unidad |
3.00 |
300,000.00 |
3.00 |
294,225.39 |
298302 |
298302-CONSTRUCCION DEPOSITO DE ALMACENAMIENTO DE AGUA PLUVIAL ALDEA LOS HUMITOS, AMATITLAN, GUATEMALA |
Metro cuadrado |
0.00 |
83,174.26 |
0.00 |
83,174.26 |
339731 |
339731-CONSTRUCCION SISTEMA DE AGUA POTABLE LINEA DE CONDUCCIÓN DESDE POZO LA JAMAICA HACIA COLONIA GARCIA AMATITLAN, GUATEMALA |
Metro |
1,065.00 |
800,000.00 |
0.00 |
0.00 |
298305 |
298305-CONSTRUCCION POZO(S) CON EQUIPAMIENTO, COLONIA SAN JORGE, AMATITLAN, GUATEMALA |
Metro cuadrado |
25.00 |
982,694.01 |
25.00 |
982,694.01 |