316841 |
MEJORAMIENTO INSTITUTO BASICO ALDEA SEMACHACA, LIVINGSTON, IZABAL |
Metro cuadrado |
332.00 |
10,000.00 |
0.00 |
0.00 |
323166 |
CONSERVACION INSTITUCIONAL EN EL FORTALECIMIENTO A LA EDUCACION BASICA DEL MUNICIPIO 2024, LIVINGSTON, IZABAL |
Mes |
12.00 |
495,000.00 |
2.00 |
112,989.00 |
298724 |
CONSTRUCCION INSTITUTO BASICO ALDEA LOS ANGELES, LIVINGSTON, IZABAL |
Metro cuadrado |
332.00 |
-30,000.00 |
0.00 |
0.00 |
316839 |
CONSTRUCCION INSTITUTO BASICO ALDEA BARRA LAMPARA, LIVINGSTON, IZABAL |
Metro cuadrado |
332.00 |
10,000.00 |
0.00 |
0.00 |