286809 |
286809-CONSTRUCCION CALLE PEATONAL (CAMINAMIENTOS) AREA URBANA Y PERIURBANA COBAN, ALTA VERAPAZ |
Kilometro |
4.41 |
3,007,110.57 |
4.41 |
1,668,337.69 |
304901 |
304901-CONSERVACION CALLE DE TERRACERIA (MANTENIMIENTO Y MEJORAMIENTO) AREA URBANA Y PERIURBANA (2023), COBAN, ALTA VERAPAZ |
Kilometro |
40.00 |
5,821,813.53 |
40.00 |
3,746,284.39 |
304903 |
304903-CONSERVACION CALLE PAVIMENTADA (BACHEO) AREA URBANA Y PERIURBANA (2023), COBAN, ALTA VERAPAZ |
Metro cuadrado |
1,280.00 |
500,950.00 |
1,280.00 |
193,290.00 |
269995 |
CONTRUCCION CICLOVIA CALZADA ROMEO LUCAS, ZONA 5 AREA URBANA, COBAN, ALTA VERAPAZ |
Kilometro |
1.60 |
2,767,341.00 |
0.00 |
0.00 |
305276 |
305276-CONSTRUCCION ESTRUCTURAS METALICAS Y CAMBIO DE TECHO PLAZA DEL CHURRASQUERO 4A. CALLE Y 5A. AVENIDA A, ZONA 1, COBAN, ALTA VERAPAZ |
Metro cuadrado |
0.00 |
0.00 |
0.00 |
0.00 |
319632 |
319632-MEJORAMIENTO CALLE (S) CON PAVIMENTO RIGIDO (ZONAS 4, 9, 10 Y 11) AREA URBANA, COBAN, ALTA VERAPAZ |
Metro |
298.00 |
102,426.50 |
0.00 |
0.00 |
301359 |
301359-MEJORAMIENTO CALLE (S) EN CARPETA DE RODADURA CON PAVIMENTO RIGIDO, AREA URBANA Y PERIURBANA, COBAN, ALTA VERAPAZ |
Kilometro |
2.30 |
11,249,447.85 |
2.30 |
11,249,447.85 |
288913 |
288913-CONSERVACION CALLE PAVIMENTADA (BACHEO) AREA URBANA Y PERIURBANA (2022), COBAN, ALTA VERAPAZ |
Metro cuadrado |
50.00 |
17,800.00 |
50.00 |
17,800.00 |
319956 |
319956-MEJORAMIENTO CALLE (S) CON PAVIMENTO RIGIDO (ZONAS 1, 7 Y 8) AREA URBANA, COBAN, ALTA VERAPAZ |
Metro |
816.00 |
224,665.74 |
0.00 |
0.00 |
319960 |
319960-MEJORAMIENTO CALLE (S) CON PAVIMENTO RIGIDO (ZONAS 3, 5, 6 Y 12) AREA URBANA, COBAN, ALTA VERAPAZ |
Metro |
1,130.00 |
469,964.45 |
0.00 |
0.00 |
288932 |
288932-CONSERVACION CALLE DE TERRACERIA (MANTENIMIENTO Y MEJORAMIENTO) AREA URBANA Y PERIURBANA (2022) COBAN, ALTA VERAPAZ |
Kilometro |
5.00 |
908,609.00 |
5.00 |
636,025.00 |