187240 |
187240-MEJORAMIENTO SISTEMA DE TRATAMIENTO AGUAS RESIDUALES BELLO HORIZONTE ZONA 21, MUNICIPIO DE GUATEMALA, DEPARTAMENTO DE GUATEMALA. |
Metro cubico |
49.00 |
1,146,313.60 |
0.00 |
0.00 |
187243 |
187243-CONSTRUCCION SISTEMA DE AGUAS PLUVIALES 14 AVENIDA ENTRE 9 CALLE Y 10 CALLE, 10 CALLE ENTRE 12 AVENIDA B Y 14 AVENIDA, 12 AVENIDA B ENTRE 10 CALLE Y 11 CALLE, ZONA 2, MUNICIPIO GUATEMALA, DEPARTAMENTO GUATEMALA. |
Metro |
226.00 |
769,214.80 |
140.74 |
765,866.00 |
283867 |
CONSTRUCCIÓN SISTEMA DE AGUAS PLUVIALES DE 13 CALLE, CALZADA AGUILAR BATRES ZONA 11 HASTA EL DESFOGUE DE RIO GUADRONCITO, ZONA 13 GUATEMALA, GUATEMALA (ARRASTRE) |
Metro |
1,742.00 |
16,000,000.00 |
0.00 |
0.00 |
|
REPARACION DEL TUNEL COLECTOR REFORMITA-MARISCAL-ROOSEVELT, GUATEMALA (ARRASTRE) -DO- |
Metro |
714.00 |
1,000,000.00 |
0.00 |
0.00 |
187250 |
AMPLIACION SISTEMA DE AGUAS PLUVIALES 8 CALLE ENTRE 9 AVENIDA Y 12 AVENIDA, 12 AVENIDA ENTRE 8 CALLE Y 9 CALLE, 9 CALLE ENTRE 12 AVENIDA Y 13 AVENIDA, 13 -DTCD- |
Metro |
71.00 |
1,415,090.40 |
4.96 |
717,023.50 |
|
REPARACION DE LA TUBERIA DE DRENAJES DE LA DESCARGA,UBICADA EN LA COLONIA EL AMPARO II DELA ZONA 7 DE LA CIUDAD DE GUATEMALA (ARRASTRE) -DO- |
Metro |
75.00 |
900,000.00 |
75.00 |
268,094.89 |