223579 |
MEJORAMIENTO SISTEMA DE AGUA POTABLE, SECTOR I, AREA URBANA, CHISEC, ALTA VERAPAZ |
Metro |
13,610.00 |
3,494,885.00 |
13,610.00 |
0.00 |
204215 |
CONSTRUCCION SISTEMA DE AGUA POTABLE ALDEA PECAJBA A LA ALDEA SEMUY, CHISEC, ALTA VERAPAZ |
Metro |
11,762.00 |
162,859.99 |
11,762.00 |
0.00 |
241884 |
AMPLIACION SISTEMA DE AGUA POTABLE, ALDEA SETZI, CHISEC, ALTA VERAPAZ |
Metro |
7,165.00 |
214,033.12 |
7,165.00 |
0.00 |
200494 |
CONSERVACION Y MANTENIMIENTO DE SISTEMA DEAGUA POTABLE, CHISEC, ALTA VERAPAZ. |
Persona |
7.00 |
2,082,692.69 |
7.00 |
2,082,692.69 |
204216 |
CONSTRUCCION SISTEMA DE AGUA POTABLE ALDEA LIMON NORTE, LIMON IMPERIAL Y SAN MIGUEL LIMON, CHISEC, ALTA VERAPAZ |
Metro |
8,320.00 |
114,896.47 |
8,320.00 |
0.00 |
267398 |
APOYO DEPOSITO DE ALMACENAMIENTO DE AGUA PLUVIAL EN 12 LUGARES POBLADOS DEL MUNICIPIO AFECTADOS POR HURACAN/TORMENTA TROPICAL ETA, CHISEC, ALTA VERAPAZ |
Articulo de plastico |
542.00 |
879,260.00 |
542.00 |
859,070.00 |
223685 |
AMPLIACION SISTEMA DE AGUA POTABLE ALDEA CANAAN, VISTA HERMOSA Y SANTA ROSA, CHISEC, ALTA VERAPAZ |
Metro |
6,360.00 |
120,026.71 |
6,360.00 |
0.00 |
267179 |
APOYO TANQUE DE MAMPOSTERIA (COMPRA DE MATERIALES PARA CONSTRUCCION DE TANQUE DE CAPTACION) ALDEA SEMAX, CHISEC, ALTA VERAPAZ |
Metro cuadrado |
48.00 |
53,145.00 |
48.00 |
53,145.00 |
271339 |
APOYO DEPOSITO DE ALMACENAMIENTO DE AGUA PLUVIAL (DOTACION ALJIBES) ALDEA SEPOC II, CHISEC, ALTA VERAPAZ |
Unidad monetaria |
63.00 |
89,775.00 |
63.00 |
89,775.00 |
227698 |
CONSTRUCCIÓN POZO (s) MECÁNICO ALDEA TZULUL QEQCHI, CHISEC ALTA VERAPAZ |
Metro |
185.00 |
2,159,063.82 |
123.36 |
1,139,279.52 |
223687 |
MEJORAMIENTO SISTEMA DE AGUA POTABLE ALDEA SEHIX CANTZUL, CHISEC, ALTA VERAPAZ |
Metro lineal |
7,230.00 |
1,639,500.00 |
5,020.00 |
1,127,284.90 |
234307 |
CONSTRUCCION SISTEMA DE AGUA POTABLE ALDEA SESAJAL LAS PACAYAS, CHISEC, ALTA VERAPAZ |
Metro |
4,978.00 |
74,923.55 |
4,978.00 |
59,412.94 |