|
CONSERVACION CARRETERAS DE TERRACERIA SAN ANTONIO HUISTA, HUEHUETENANGO |
Kilometro |
15.00 |
2,500,000.00 |
0.00 |
0.00 |
| 352423 |
352423-CONSERVACION CARRETERAS DE TERRACERIA 2025, SAN ANTONIO HUISTA, HUEHUETENANGO |
Kilometro |
14.00 |
1,000,000.00 |
9.35 |
664,383.31 |
| 321890 |
321890-CONSTRUCCION CARRETERAS DE TERRACERIA (APERTURA) CASERIO EL PROGRESO, SAN ANTONIO HUISTA, HUEHUETENANGO |
Kilometro |
0.50 |
200,000.00 |
0.00 |
0.00 |